Making New UG Drain along 30L from 5ED to 2WD and along 2WD from 30L to 40L to Divert Rise Side Seepage Water to Main Water Body at Dip Side 3WD 41L in Chora RVI Seam of Chora 7 and 9 Pit Colliery for Monsoon Preparation 2026-27 under Kenda Area ECL
Bid Value
—
Closing Date
27 July 2026
Days Remaining
Expired
AI Tender Synthesis
Pre-generatedThe project involves specialized underground drainage construction within a colliery requiring specific expertise, and the estimated value is not provided, necessitating further investigation.
What's Being Procured
Eastern Coalfields Limited (ECL) is procuring the construction of a new underground drain to divert rise side seepage water to the main water body at the dip side within the Chora RVI seam of Chora 7 and 9 pit colliery. The project involves constructing the drain along specific coordinates for monsoon preparation during 2026-27.
Eligibility Criteria
None identified
Technical Scope
- 01Construction of new Underground (UG) Drain along 30L from 5ED to 2WD.
- 02Construction of new Underground (UG) Drain along 2WD from 30L to 40L.
- 03Diversion of rise side seepage water to the Main Water Body at Dip Side 3WD 41L.
- 04Works to be executed in Chora RVI Seam of Chora 7 and 9 Pit Colliery for Monsoon Preparation 2026-27.
Documents Required
None identified
Watch Out For
- Estimated value is not specified, which makes it difficult to assess the financial opportunity.
Bid Value
—
Summary
Eastern Coalfields Limited (ECL) under its Kenda Area is inviting bids for the construction of a new underground (UG) drain. This essential infrastructure project aims to divert rise side seepage water to the main water body located at dip side 3WD 41L. The scope of work involves constructing the drain along 30L from 5ED to 2WD and subsequently along 2WD from 30L to 40L. This initiative is crucial for monsoon preparation during the 2026-27 period within the Chora RVI seam of Chora 7 and 9 pit colliery.