NCTPS II Operation Circle O E Division to Carry Out Shift Works in Switch Gear at 3.5, 12.5, 31.5 and UCB of Unit I & II
Bid Value
—
Closing Date
07 August 2026
Days Remaining
6 days
AI Tender Synthesis
Pre-generatedThe tender describes specific electrical maintenance tasks in a power plant with clear scope, but the absence of an estimated value and detailed eligibility criteria necessitates careful review to assess financial viability and competitiveness.
What's Being Procured
TANGEDCO is procuring services for essential shift works on the switch gear at the North Chennai Thermal Power Station II (NCTPS II). This involves operations and maintenance tasks at specific locations within Unit I and Unit II of the power station.
Eligibility Criteria
None identified
Technical Scope
- 01Carrying out shift works in switch gear at designated locations 3.5, 12.5, 31.5, and UCB within Unit I and Unit II of NCTPS II
- 02Performing operations and maintenance tasks on switch gear at NCTPS II
Documents Required
None identified
Watch Out For
- Estimated value is not specified, making financial assessment difficult
- Detailed eligibility criteria are not provided, requiring further review of tender documents for qualification
Bid Value
—
Summary
This tender, issued by TANGEDCO through its CE/NCTPS-II and SE-Operation-NCTPS-II divisions, is for carrying out essential shift works on the switch gear at the North Chennai Thermal Power Station II (NCTPS II). The scope of work specifically involves operations and maintenance tasks at designated locations 3.5, 12.5, 31.5, and the UCB within both Unit I and Unit II of the power station. The last date for bid submission for this project is August 7, 2026. Tender documents can be downloaded until August 1, 2026.