Process Control System Engineering, Supply, Installation, and Software Development for Captive Power Plant, HWP Manuguru
Bid Value
—
Closing Date
03 September 2026
Days Remaining
32 days
AI Tender Synthesis
Pre-generatedThe tender offers a substantial scope for a critical industrial system but lacks an estimated value and specific eligibility criteria, necessitating further review of the full tender document.
What's Being Procured
The Heavy Water Board at HWP Manuguru is procuring a comprehensive Process Control System for Unit 2 and Unit 3 of its Captive Power Plant. The scope covers engineering, hardware supply, panel fabrication, software development, installation, commissioning, training, and documentation.
Eligibility Criteria
None identified
Technical Scope
- 01Process Control System Engineering
- 02Hardware Supply for Process Control System
- 03Panel Fabrication
- 04Software Development for Process Control System
- 05Testing and Inspection
- 06Installation of Process Control System
- 07Commissioning of Process Control System
- 08Training for operational personnel
- 09Documentation of the entire system
Documents Required
None identified
Watch Out For
- Estimated Value is not specified, making financial assessment difficult.
- Detailed eligibility criteria are not provided in the summary, requiring review of the full tender document for competitive assessment.
Bid Value
—
Summary
This tender by the Heavy Water Board, located at HWP Manuguru, is for the comprehensive engineering, supply of hardware, fabrication of panels, software development, testing, inspection, installation, commissioning, training, and documentation of a process control system. The procured system is intended for Unit 2 and Unit 3 of the Captive Power Plant at HWP Manuguru. The scope covers the complete lifecycle from design to final operational handover and training.