Widening and Strengthening Reconstruction of Existing 2 Lane To 2 Lane With Paved Shoulder Configuration From Existing Km 338.100 Design Km 333.400 To Km 368.000 Of NH 58
Bid Value
—
Closing Date
18 June 2026
Days Remaining
1 days
AI Tender Synthesis
Pre-generatedThis is a significant road infrastructure project with a clear scope, but critical information like the estimated value and detailed eligibility criteria is missing, necessitating further document review.
What's Being Procured
The Ministry of Road Transport and Highways is procuring the widening and strengthening reconstruction of an existing 2-lane road to a 2-lane road with a paved shoulder configuration. The project covers a section of National Highway 58 (NH 58) from km 333.400 to km 368.000, aiming to enhance road infrastructure and capacity.
Eligibility Criteria
None identified
Technical Scope
- 01Widening of existing 2-lane road configuration
- 02Strengthening of existing road infrastructure
- 03Reconstruction of existing road sections
- 04Construction of paved shoulder configuration
- 05Work on NH 58 between design km 333.400 and km 368.000
Documents Required
None identified
Watch Out For
- Estimated Value: Not specified (impacts financial planning and bid strategy)
- Eligibility Notes: N/A (crucial criteria for bidder qualification and competitiveness are absent)
Bid Value
—
Summary
This tender is for the widening and strengthening reconstruction of an existing 2-lane road to a 2-lane road with a paved shoulder configuration. The scope of work covers the section from existing km 338.100 (design km 333.400) to km 368.000 of National Highway 58 (NH 58). The project is being procured by the Ministry of Road Transport and Highways. The primary objective is to enhance road infrastructure and capacity.