Great Nicobar Island Gas Engine Power Project (108 MW +- 5 MW) And Sub-Station 2 And 4 Located At Great Nicobar Island, India
Bid Value
—
Closing Date
01 September 2026
Days Remaining
30 days
AI Tender Synthesis
Pre-generatedThis is a significant power generation and infrastructure project with a clear scope and substantial scale, indicating a strong opportunity for qualified bidders.
What's Being Procured
NTPC Limited is procuring the construction and development of a 108 MW Gas Engine Power Project along with Sub-Station 2 and 4. This major energy infrastructure project is located on Great Nicobar Island, India, aimed at enhancing regional power capabilities.
Eligibility Criteria
None identified
Technical Scope
- 01Construction of a 108 MW (+/- 5 MW) Gas Engine Power Project.
- 02Construction of Sub-Station 2.
- 03Construction of Sub-Station 4.
- 04Development of associated power generation and distribution infrastructure on Great Nicobar Island.
Documents Required
None identified
Watch Out For
- Estimated value for the project is not specified upfront.
Bid Value
—
Summary
NTPC Limited is procuring services for the Great Nicobar Island Gas Engine Power Project, which has a capacity of 108 MW (with a +/- 5 MW tolerance). The project also includes the construction of Sub-Station 2 and Sub-Station 4. All components of this significant infrastructure development are to be located on Great Nicobar Island, India. This initiative aims to enhance the region's power generation and distribution capabilities. The tender was published by NTPC Limited.