Design, Manufacture, Fabrication, Inspection, Supply, Transportation, Installation, Testing, Commissioning, Training of Friction Buffer Stops of 6500 MT, 2000 MT Suitable for Heavy Haul Traffic
Bid Value
—
Closing Date
16 July 2026
Days Remaining
Expired
AI Tender Synthesis
Pre-generatedThe tender offers a comprehensive scope for specialized railway equipment but lacks an estimated value and explicit eligibility criteria in the provided summary, requiring further document review.
What's Being Procured
IRCON International Limited is seeking bids for the complete lifecycle of Friction Buffer Stops, including design, manufacturing, supply, installation, testing, commissioning, and training. These buffer stops, with capacities of 6500 MT and 2000 MT, are specifically for heavy haul traffic operations. The project involves end-to-end delivery to respective station yards.
Eligibility Criteria
None identified
Technical Scope
- 01Design of Friction Buffer Stops (6500 MT, 2000 MT)
- 02Manufacture of Friction Buffer Stops
- 03Fabrication of Friction Buffer Stops
- 04Inspection of Friction Buffer Stops
- 05Supply of Friction Buffer Stops
- 06Transportation of Friction Buffer Stops to respective station yards
- 07Installation of Friction Buffer Stops
- 08Testing of Friction Buffer Stops
- 09Commissioning of Friction Buffer Stops
- 10Training on Friction Buffer Stops operation and maintenance
- 11Ensuring suitability for Heavy Haul Traffic
Documents Required
None identified
Watch Out For
- Estimated Value Not Specified
Bid Value
—
Summary
IRCON International Limited is inviting bids for the comprehensive project involving the Design, Manufacture, Fabrication, Inspection, Supply, and Transportation of Friction Buffer Stops. The scope also includes their Installation, Testing, Commissioning, and providing Training. The required buffer stops are of 6500 MT and 2000 MT capacities, specifically designed to be suitable for heavy haul traffic operations. The transportation is to be carried out to respective station yards.