What's Being Procured
South Eastern Coalfields Limited is procuring the construction of 75 fly ash ventilation stoppings for specific CM development panels (119D, 80LW, 85LW, 81LW) in V-Top. This work is essential for mining infrastructure and safety in underground coal mining operations.
Eligibility Criteria
None identified
Technical Scope
- 01Construction of 75 fly ash ventilation stoppings.
- 02Installation of 24 units in CM development panel 119D (between 120D and 121D).
- 03Installation of 17 units in CM development panel 80LW (between 79L and 80L).
- 04Installation of 17 units in CM development panel 85LW (between 84L and 85L).
- 05Installation of 17 units in CM development panel 81LW (between 89L and 90L).
Documents Required
None identified
Watch Out For
- Estimated value not specified, making financial assessment difficult.
- Detailed eligibility criteria are not provided in the summary.
Bid Value
—
Summary
South Eastern Coalfields Limited is inviting tenders for the construction of 75 fly ash ventilation stoppings. These stoppings are to be built for the CM development panel no. 119D (24 units) between 120D and 121D, 80LW (17 units) between 79L and 80L, 85LW (17 units) between 84L and 85L, and 81LW (17 units) between 89L and 90L in V-Top. The procurement is being conducted by South Eastern Coalfields Limited.