Essential Backup Power using Energy Storage System (ESS) along with Generation (Solar Power Plant) in PWD Rest House Ladwa in District Kurukshetra.
Bid Value
₹16.13 Lakh
Closing Date
26 June 2026
Days Remaining
7 days
AI Tender Synthesis
Pre-generatedThe tender presents a clear scope for renewable energy infrastructure with a reasonable estimated value, but critical details regarding eligibility, specific technical requirements, and contractual terms are missing.
What's Being Procured
This tender is for the procurement and installation of an Essential Backup Power system, including an Energy Storage System (ESS) and a Solar Power Plant. The project aims to provide reliable renewable backup power for the PWD Rest House in Ladwa, Kurukshetra, managed by the Electrical Engineer Ambala division under the Haryana Government.
Eligibility Criteria
None identified
Technical Scope
- 01Procurement and installation of an Energy Storage System (ESS)
- 02Procurement and installation of a Solar Power Plant
- 03Integration of backup power generation using renewable energy sources for PWD Rest House Ladwa
Documents Required
None identified
Watch Out For
- Lack of detailed information on specific eligibility criteria, financial requirements, technical specifications, and contractual terms (e.g., duration, payment terms) in the provided summary.
Bid Value
₹16.13 Lakh
Summary
This tender is for the procurement and installation of an Essential Backup Power system, which includes an Energy Storage System (ESS) and a Solar Power Plant, for the PWD Rest House located in Ladwa, District Kurukshetra. The procurement is being managed by the Engineer-in-Chief PW(B and R) Department, Haryana Government, specifically through the Electrical Engineer Ambala division. The primary goal is to provide reliable backup power generation using renewable energy sources for the specified government property. Details regarding the exact specifications, quantities, and scope of work for the project will be outlined in the complete tender documents. Key deliverables, milestones, contract duration, payment terms, and specific compliance requirements are not provided in the current raw data.