Installation of a 4000 GPM Pump Motor Set and Pipeline for Dewatering Jarlahi Patch, Including Maintenance
Bid Value
—
Closing Date
14 August 2026
Days Remaining
9 days
AI Tender Synthesis
Pre-generatedThe tender outlines a clear installation and maintenance project for a critical dewatering system, but the absence of an estimated value necessitates further investigation into opportunity size and potential competitive landscape.
What's Being Procured
Bharat Coking Coal Limited is seeking a contractor for the installation of a 4000 GPM pump motor set and its delivery pipeline at the Jarlahi patch's 2nd sump for dewatering operations. The project also includes comprehensive maintenance of the installed system under AMP Colliery, focusing on long-term operational efficiency.
Eligibility Criteria
None identified
Technical Scope
- 01Installation of a 4000 GPM pump motor set on the ground level of the Jarlahi patch's 2nd sump.
- 02Erection of the pump's delivery pipeline from the sump to SILO nalla (3rd range).
- 03Comprehensive maintenance of the installed pump and associated pipeline under AMP Colliery.
Documents Required
None identified
Watch Out For
- Estimated value not specified, making initial assessment of project size and profitability difficult.
Bid Value
—
Summary
This tender issued by Bharat Coking Coal Limited is for a significant infrastructure project at the Jarlahi patch. The primary scope involves the installation of a powerful 4000 GPM pump motor set directly on the ground level of the Jarlahi patch's 2nd sump. A crucial part of the project includes the precise erection of the pump's delivery pipeline, which will transport water from the sump all the way to SILO nalla (3rd range). This entire system is vital for the effective dewatering operations of the Jarlahi patch (B). Additionally, the awarded contractor will be responsible for the comprehensive maintenance of both the installed pump and its associated pipeline under the AMP Colliery. This ensures the long-term operational efficiency and reliability of the dewatering infrastructure.