TendersConstruction
CPPPConstructionCentral

Special Repair (SR) Work for Restoration of Guide Bundh and Apron at Upstream Side of Leesh River Bridge

Bid Value

Closing Date

03 September 2026

Days Remaining

33 days

AI Tender Synthesis

Pre-generated
Review Carefully

The estimated value is not specified, and detailed eligibility criteria are absent, requiring further review to assess the opportunity size and competitiveness.

What's Being Procured

The Ministry of Road Transport and Highways is inviting bids for Special Repair (SR) work. This project involves the restoration of the Guide Bundh and Apron on the upstream side of the Leesh River Bridge. The aim is to ensure the structural integrity and functionality of these critical bridge components.

Eligibility Criteria

  • 01Financial: Not specified in the summary.
  • 02Technical: Not specified in the summary.
  • 03Registration: Not specified in the summary.

Technical Scope

  • 01Restoration of Guide Bundh at Upstream Side of Leesh River Bridge
  • 02Restoration of Apron at Upstream Side of Leesh River Bridge
  • 03Undertake necessary repairs and rehabilitation to ensure structural integrity and functionality of critical bridge components.

Documents Required

None identified

Watch Out For

  • Estimated Value not specified, making it difficult to assess potential revenue and resource allocation.
  • Detailed eligibility criteria are not provided in the summary, which could lead to unforeseen restrictions or disqualifications.

Bid Value

Summary

This tender from the Ministry of Road Transport and Highways invites bids for Special Repair (SR) work. The scope of work involves the restoration of the Guide Bundh and Apron located on the upstream side of the Leesh River Bridge. The primary objective is to undertake necessary repairs and rehabilitation to ensure the structural integrity and functionality of these critical bridge components. This project falls under the category of civil construction and infrastructure maintenance.

Tender TitleSpecial Repair (SR) Work for Restoration of Guide Bundh and Apron at Upstream Side of Leesh River Bridge
DepartmentMinistry of Road Transport and Highways
State / RegionCentral
CategoryConstruction
Bid Value
Closing Date03 September 2026
PortalCPPP
External ID
cppp-MTM5ODg0MTU=A13h1OGQ2NzAxYTMwZTJhNTIxMGNiNmEwM2EzNmNhYWZhODk=A13h1OGQ2NzAxYTMwZTJhNTIxMGNiNmEwM2EzNmNhYWZhODk=A13h1MTc4NTI0MDAxNA==A13h1V0JQV19SZC9Tci4gU0UvTkhDMy9lTklCLTA1LzI2LTI3A13h1MjAyNl9Nb1JUSF85MTk1MTlfMQ==